W/E 27th July

Well things are moving along. The RGS and RGA frames have been welded as per the factory ‘upgrade’ – brilliant job as the picture shows. The welding doesn’t follow the factory directions precisely because my welder blended the additional plate from the headstock into the existing shuttering. He argued it was unnecessary to undo the original work by cutting some of the original work out.

Welded up RGS frame

Welded up RGS frame

Dismantled various other RGA brackets ready to take them off for shot blasting. There isn’t much bracketry on the RGA so not a lot of work. I’m also going to sand the swinging arm down manually as the bearings seem okay and shot blasting would involve a lot of masking up to save them.

Carried on cleaning the crankcases with paraffin and also went over the barrels which I failed to get down to the engine shop for measuring.

Nick 🙂

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s